Contract/Job Executed


Engineering And PMC Job to be Executed

  • Dismantling Project of 2,50,000 TPA Lignite coal Drying and Briquetting plant from USA. Client - PT Thriveni, Indonasia.
  • Design engineering, Project management, Erection and Commissioning of 2,50,000 TPA Lignite coal drying and briquetting plant in Indonesia. Client - PT Thriveni, Indonesia.
  • Management consultancy along with Techno plus to enhance production capacity from 1.5 to 2.2 MTPA. Client - Electro Steel Ltd., Bokaro.
  • DPR making for Waste heat Recovery boiler for a Non-Recovery Type Coke Ovens at Gujarat.
  • Feasibility study, scheme preparation and procurement services for “Crushing and Screening of air-cooled BF slag”. Client - TATA Steel.
  • Review of Engineering drawing and documents submitted by technologist and consultant for DIP plant. Client - TATA Metallics, Kharagpur.
  • Auditing / planning & assistance in completion of 14 KM double circuit conveyor, cost assessment for completion of work. Client – NTPC, Hazaribagh.
  • Pre feasibility report for 11 KM pipe line conveyor to carry iron ore at Odisha. Client ATHA Group.

O & M Contracts

  • Technical Partner for O & M of India’s Longest 18KM Long belt conveyor system of 3000 TPH capacity at Utkal Alumina, Odisha Since Jan’17. Aditya Birla
  • AMC of 450 VVF Drive maintenance for Aditya Birla Plant at Odisha from last five years from 2015. Aditya Birla
  • AMC for 2200 VFD of various make and size up to 25 MVA at JSPL- Angul, Orissa.
  • AMC for entire Automation System (720 nos. PLC & Controllers) at JSPL – Angul, Orissa.
  • O & M of All Electrical & Mechanical equipment for Coal Drying & Briquette plant at Indonesia. PT Thriveni, Indonesia.
  • Refurbishment of hydraulic gate of 50 MW & 37 MW Hydel power plant at Rengali & Burla. Odisha Hydro power corporation.








EPC Job Executed

  • Execution of 100 KW roof top Solar Power Plant for a cold storage at Bihar – Begusaria. Client - Navneet Cold Storage.
  • Design, engineering, supply and execution of 33 KV and 11 KV substation and 2 KM OH TL work at Hazaribag. Client – Thriveni Sanik Mining Pvt. Ltd.
  • 5 KM, 33 KV transmission line on Lattice structure along with Civil Work at NTPC Hazaribag. Client - ABB
  • Design, engineering, supply and execution of 415 V power distribution system and 1.5 KM OH TL work at Hazaribag. Client – Thriveni Sanik Mining Pvt. Ltd.
  • 11 KV power distribution network of around 8 KM. at Ranchi. Client - Jharkhand Electricity Board.
  • Shifting of 33KV substation in non forest area at Tikri, Odisha. Client - Aditya Birla.